Quote:
Originally Posted by Ed_Dinning
Looking in loft at the PVC wiring, it was all run into a large BICC plastic box
ED
|
That would be the then current practice of the "spider/octopus" wiring system (one big central JB for the various switches and feeds) for the lighting circuits. it can be still a very good system when done properly.
I have used a modern updated similar system fairly recently about 3 years ago (on office re-fits) as it was the best way of arranging some fairly complex switching schemes along with the EM lighting requirements, just not with screwits I hasten to add